Hutton, Essex
EICR in Hutton CM13
Booking an EICR is easier when you know how the visit runs.
- Send a short enquiry
- Covering Essex
- EICR and related services
An EICR in Hutton, step by step
Brentwood Electrical Services covers Hutton and the wider Essex area, and this page walks through an electrical installation condition report from start to finish. Use the enquiry form when you are ready to ask about your property.
Before the visit: what to sort out
An electrical installation condition report, often shortened to EICR or just condition report, is a formal look at the fixed wiring in a property. It covers things like the circuits, the consumer unit, sockets, switches and light fittings. It does not usually cover your appliances, which is where PAT testing comes in as a separate job.
Before the visit, tell the electrician why you need the report. A landlord, a seller and a business owner may all need slightly different paperwork. It also helps to share any previous reports or records of electrical work, and to make sure the electrician can reach the consumer unit, any outbuildings and any areas with their own fuse board. Move stored items away from the consumer unit if you can.
Step one: the conversation and the walk round
A typical visit starts with the electrician confirming the scope of the inspection: which parts of the property are included, and whether there are any known problems such as tripping circuits, flickering lights or warm sockets. If you have noticed something, say so at this point.
Next comes a visual inspection. The electrician looks at the consumer unit, the condition of cables where they can be seen, earthing and bonding connections, and accessories such as sockets and switches. They are checking for damage, wear, overloading and signs that older wiring has been altered badly. This part is mostly looking rather than testing, and it tells them where to focus.
Step two: the testing
Electrical testing is the longest stage. Using specialist test equipment, the electrician checks each circuit for things like continuity, insulation resistance and how the protective devices respond to a fault. To do this safely, power has to be switched off to circuits for periods of time, and sometimes to the whole property.
Plan around that. Save your work, expect lights and sockets to go off, and think about anything that needs constant power, such as a freezer, medical equipment or a broadband router. If you are a landlord with tenants in place, let them know the date in advance. In a shop or office, choose a time that causes the least disruption. The length of the visit depends on the size of the property and the number of circuits, so ask for a rough idea when you book.
Step three: the report and what the codes mean
Once the testing is done, the findings are written up in the condition report. The overall result is normally satisfactory or unsatisfactory. Any issues are given a code. C1 means danger is present and immediate action is needed. C2 means potentially dangerous. C3 means improvement is recommended. FI means further investigation is required.
A C1, C2 or FI usually leads to an unsatisfactory result, so do not be alarmed if the report lists several observations. Ask the electrician to explain each one in plain terms, what caused it and what fixing it involves. Keep the report safe, as buyers, letting agents, insurers and the next electrician may all ask for it.
After the report: what comes next
If the result is satisfactory, the report simply shows the installation was in an acceptable condition on the day, along with a recommended date for the next inspection. For rented homes this is commonly within five years, though the right interval depends on the property and its condition. Rules for landlords and other property owners can change, so check GOV.UK for the current position.
If the result is unsatisfactory, the usual next step is remedial work. That might be a minor repair, new circuits or a consumer unit upgrade if the existing one is outdated. Get the work quoted clearly in writing, and ask whether a follow-up inspection is needed to update the report. Whoever you hire, it is sensible to choose a qualified electrician and ask what proof of their competence they can show you.
Questions about this
Will the power be off during an EICR?
Yes, for some of the time. Circuits need to be isolated to be tested safely, so expect the power to go off in stages, and sometimes for the whole property. Plan for anything that needs constant power.
Do I need to be at the property?
Someone needs to give access, and it helps if you can be there to answer questions at the start and go through the findings at the end. Landlords often arrange access with their tenants instead.
What is the difference between an EICR and PAT testing?
An EICR looks at the fixed wiring, such as circuits, sockets and the consumer unit. PAT testing checks portable appliances. They are separate jobs, and one does not replace the other.
What happens if my EICR is unsatisfactory?
The report will list what needs fixing and how urgent it is. Remedial work is then carried out, and you can ask for the report to be updated once the issues are resolved.
Why Hutton customers contact us
Covers Hutton
Brentwood Electrical Services serves Hutton, along with Shenfield, Ingatestone, Kelvedon Hatch and Brentwood itself.
An EICR for your situation
Choose from a landlord EICR, an EICR for buying or selling, or a commercial EICR, depending on why you need the report.
Help with what the report finds
Consumer unit upgrades and general electrician work are also on offer if the report points to something that needs attention.